Old design: Rs500 banknote will cease to be legal tender
Old design: Rs500 banknote will cease to be legal tender

KARACHI:

Work is in progress on Thar coal-based power generating projects and steps are being taken to provide electricity and water to Thar area, so that infrastructure development could be further boosted, said Sindh Chief Secretary Ghulam Ali Pasha here on Thursday.

He was talking to a South Korean delegation. The Koreans showed interest in solar and wind power generation in Sindh.

Published in The Express Tribune, December 3rd, 2010.

Leave a comment

Your email address will not be published. Required fields are marked *